We are ready to go on the 26th.
The roll off roof observatory is now operational and the 12"
Cassagrain scope from OU is now in stalled.
We have some old church pews installed in the observatory and in the
main meeting room.
The water has been tested and is good for drinking.
We also have an Ozarka water dispenser on site.
We have an operational stove and microwave on site as well as a
fridge. The water to the fridge is not hooked up but Boyd is trying
to get that done for this week.
I talked to Justin McCrary last night while we were looking through
the scope and he said that we should expect a big crowd this coming
Saturday night.
I hope that those of you reading this will be able to come and join
us.
Thanks,
Jeff