Hi! I need your help. According to PFMEA´s methodology, severity is based on certain criterias. However, I consider that this criteria table is subjective due...
67
CHEOW YIN LEONG
cheowyl@...
Sep 28, 2000 9:02 am
hmmm..hi guys...glad to hear your question... its quiet hard to commonize all the different severities ranking...because all over the world we are using this...
68
Branimir Todorov
btd@...
Oct 2, 2000 6:53 am
The PFMEA for automotive industry state: The team should agree on a evaluation criteria and ranking system, which is consistent, even if modified for...
69
FMEA Info centre
fmea@...
Oct 11, 2000 11:36 am
We would like to use an FMEA computer package to do failure predictions on plant equipment. Our main area of business is metallurgical failures. The idea would...
70
looks@...
Oct 31, 2000 11:27 am
I need help for FMEA reliability investigation. Please send me information, work sheets, tips, etc Arnold E. Looks Maintenance Planning ...
71
FMEA Info centre
fmea@...
Nov 16, 2000 8:10 pm
"My brain bulb is dim and I need help. There is much material available on how to implement FMEA in to the design phase - but I can find nothing on how to...
72
Thayer Laurence L DLVA
ThayerLL@...
Nov 16, 2000 9:50 pm
This will depend on the product, but most developments follow the following sequence Product A Product A mod 2 Product A mod 3 Product B(Product A +) Each of...
73
Mallard Hubert
hubert.mallard@...
Nov 17, 2000 8:47 am
To have a documentation for example which is continuously updating we use framemaker from Adobe and never MSword. In Framemaker we have notion of conditional...
74
Morrow Paul V IHMD
morrowpv@...
Nov 17, 2000 6:23 pm
I am trying to develop a process-oriented Potential Failure Mode & Effects module for an in-house Quality Planning course and I would like to have a more...
75
mstaddon@...
Nov 17, 2000 6:26 pm
Taking your example, a paper based system might look something like this:- Product A -> FMEA produced called "Product A" Product A mod 2 -> FMEA produced...
76
Ronald F Ellis
ronald.f.ellis@...
Nov 17, 2000 7:25 pm
Check out the PPAP 3rd edition from AIAG. In this edition, a special section (appendix F) was included for Bulk Materials. It describes ...
77
Ronald F Ellis
ronald.f.ellis@...
Nov 17, 2000 7:44 pm
It seems to me that an easy way to preserve history is to update the existing FMEA with insertion of a new row for a particular line item which has C.I....
78
Ochs, John G
jochs@...
Nov 17, 2000 8:58 pm
Paul, ` These are the customer-focused severity ratings we use for our Process FMEA activities. Hope they are of some assistance. Ranking...
79
Edwin Cheow
cheowyl@...
Nov 18, 2000 4:01 pm
hey guys, I am working in a harddisk manufacturing factory...they havent implement the FMEA concept widely yet...so i like to introduce this powerful tools to...
80
Paul Rock
rockqmc@...
Nov 18, 2000 4:01 pm
Anyone have an example of using the FMEA process in service design or service delivery, e.g. equipment installation in a major telecom center. Paul...
81
Miri Ori
mirio@...
Nov 20, 2000 8:07 am
PLEASE DON'T SEND MAIL TO THIS ADDRESS!!!!!!!!!!!!!!1 ... From: Edwin Cheow [mailto:cheowyl@...] Sent: Saturday, November 18, 2000 3:15 AM To:...
82
Mayer, Houston
houston.mayer@...
Nov 20, 2000 2:44 pm
My example is inwork and is part of a GE Black Belt Project. It my stimulate some thinking along the service lines. Houston ... From: Paul Rock...
83
MASOUD FOROUGHI
m_foroughi@...
Nov 20, 2000 2:44 pm
Hello, I will find some sample about BIW (body in white) in DFMEA except FORD samples.Can you help me? M.FOROUGHI-11/19/2000 ...
84
Shannon Leong
leong_shannon@...
Nov 21, 2000 9:15 am
Hi all, Wonder if anyone has an example for the above-mentioned? Thanks Cheers Shannon...
85
Steve Pickett
spickett@...
Nov 21, 2000 9:15 am
If you did version management of the FMEA in a tool like StarTeam, any version could be found. You could pin labels to the different versions for the different...
86
Johan Thoelen
johan.thoelen@...
Nov 21, 2000 9:31 am
Hello, Can someone give me a hint how I can use FMEA in the chemical process industry as a part of a RBI program. I am looking for a simple system how to acess...
87
rita salive
ritasalive@...
Nov 29, 2000 7:53 am
You have to be honest with yourself and with your company philosophy, What are your needs? Do you really want to trace all the information? Before putting...
88
Hubert Hell
hubert_hell@...
Nov 29, 2000 7:53 am
Hello everybody, first of all - sorry, am using FMEA in German language, therefore the translations might not reflect the correct terms within the English...
89
Wijnants, G.H. (Geert...
geerthenk.wijnants@...
Nov 29, 2000 8:42 am
Hubert, as you describe it, I assume that the functional break down of your system wasn't complete. For instance in a different situation: the break down of an...
90
Dobry Alexander (T/DS...
alexander.dobry@...
Nov 29, 2000 8:42 am
Hello Hubert, executing FMEAs for Banking applications sounds interesting. Theoretically you have to options to structure a system as a signal flow structure ...
91
Hubert Hell
hubert_hell@...
Nov 30, 2000 7:56 am
Yes, I suppose that's where I lost my line of thoughts - mixing clear and thorough component structure with signal flow (Petri net). Many thanks for your...
92
ahonarvar@...
Jan 15, 2001 10:27 pm
Hi I'm looking for some information about the implementation of FMEA in chemical factories. Your help would be welcomed....
93
Eric
fmea@...
Feb 4, 2001 10:02 pm
Hi, On the web site we received a question about the re-use of FMEA data for a general design optimization. FMEA starts from a functional analysis. This...
94
jjalvarez_70@...
Mar 10, 2001 7:51 am
First of all, let me introduce my self. My name Juan Alvarez, I am a product engineer working for a large US automotive systems supplier in Juarez, Mexico. We...
95
Peter Allica
allicapg@...
Mar 10, 2001 12:49 pm
If you do not change how long will you have american customers for? If your failure rate is this high you will have difficulty finding people to sell them to....